Through its extensive experience in TBM technology, EBERK participates in Tunnel Construction Projects as contractor including TBM operation & excavation, segment manufacturing, and other Tunnel Construction activities.
E-BERK’s year’s long experience on TBMs has proved invaluable when the company ventured into the tunnel construction business. Coupled with its technical know-how over Tunnel Boring Machines and the efficient operation techniques, the company has been able to sustain a faster and higher quality tunnel building operation compared to the industry standards in similar geological conditions.
Length: 20.000m
Tunnel Usage: Deep Discharge Transmission
Length: 4.716m
Tunnel Usage: Barrage Water Conveyance
Length: 5.700m
Tunnel Usage: Irrigation Water Conveyance
Length: 1.600m
Tunnel Usage: Rain Water Drain Tunnel