Tunisia Rades Combined Cycle Power Plant Project Cooling Tunnel
Main Contractor : Gama Holding
Scope of E-BERK : COMBINED CYCLE POWER PLANT PROJECT COOLING TUNNEL
Line Length : 231 m
Number of TBM : 1 MTBM
Excavation Diameter : 2435mm
Segment Length : 3000mm
Segment Outer Diameter : 2400mm
Segment Inner Diameter : 2000mm
Contract Date : 22.06.2018
Start Date : 18.10.2018
Completion Date : 27.03.2019
Scope of Özsöz : In order to connect the cooling water of the natural gas conversion facility in Tunisia Rades region, 2 tunnels are the work of excavation and pipe driving with a 240-meter in total with an E-BERK MTBM machine.