Main Contractor : AGA Enerji Nak. Mad. İnş. San. Ve Tic.A.Ş.
Scope of Özsöz : TBM operation between İncirli-Kirazlı
Line Length : 6.975 m (Double Line total)
Number of TBM : 2
Excavation Diameter : 6570 mm
Segment Length : 1,50 m
Segment Outer Diameter : 6300 mm
Segment Inner Diameter : 5700 mm
Contract Date : 16.10.2020
Start Date : 16.11.2020
Completion Date : 05.05.2022
Scope of Özsöz : Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.