Adıyaman Koçali Irrigation Channel and Tunnel Project
Main Contractor : Kormak İnşaat Malzemeleri Sanayi ve Tic. A.Ş.
Scope of Özsöz : Koçali Irrigation TBM TUNNEL PROJECT
Length : 5.194 m
Number of TBM : 1
Excavation Diameter : 4980 mm
Segment Length : 1,50 m
Segment Outer Diameter : 4800 mm
Segment Inner Diameter : 4200 mm
Contract Date : 01.02.2021
Starting Date : 01.12.2021
Estimated Completion Date : March, 2023
Scope of Özsöz : Provision of TBM and Backup Units. Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.