Ergene Deep Discharge Waste Water Transmission Project

Main Contractor : Özgün Yapı Sanayi ve Ticaret A.Ş<
Scope of E-BERK :
Waste Water Transmission Tunnel Project. E-Berk’s manufactured “Anadolu“ and “Lale” TBMs, were used at Ergene Deep Discharge Waste Water Tunnel Constuction Project for Tunnel A Line and Tunnel B Line.
Tunnel A Line 1 Length : 3600 m
Tunnel A Line 2 Length : 6383 m

Tunnel A Line B Length : 9923 m

Number of TBM : 3

Excavation Diameter for Tunnel A Line 1 : 3850 mm

Diameter after Second Lining for Tunnel A Line 1 : 2800 mm

Segment Length Tunnel A Line 1 : 1,20

Segment Outer Diameter Tunnel A Line 1 : 3600 mm

Segment Inner Diameter Tunnel A Line 1 : 3200 mm

Excavation Diameter for Tunnel A Line 2 : 3250 mm

Diameter after Second Lining for Tunnel A Line 2 : 2000 mm

Segment Length Tunnel A Line 2 : 1000 mm

Segment Outer Diameter Tunnel A Line 2 : 3000 mm

Segment Inner Diameter Tunnel A Line 2 : 2600 mm

Excavation Diameter for Tunnel B : 3250 mm

Diameter after Second Lining for Tunnel B : 2000 mm

Segment Length Tunnel B : 1000 m

Segment Outer Diameter B : 3000 mm

Segment Inner Diameter B : 2600 mm

Contract Date for Tunnel A&B Lines : 03.07.2015

Start Date for Tunnel : 05.01.2016

Completion Date for Tunnel A : 15.04.2021

Start Date for Tunnel B : 08.11.2016

Completion Date for Tunnel B : 15.12.2021

Scope of E-BERK : Tunnel construction and segment coating work with Anadolu TBM and Lale TBM with an inner diameter of 2000 mm.