EM-2301 ASYA

 

EM 2301

 

EM2301 ASYA EPB  TBM.

 

  • Modal Year : 2018
  • Production Date : 08.11.2018
  • Boring Diameter :2,455 mm
  • Total Installed Power : 650 kW
  • TBM Length in Total : 10 m
  • Excavated Meters in Total : 240 mt
Technical Specifications...
 
Slider
Slider
Slider